 |
 |
|
|
 |
|
 |
 |
PLANNING,
ESTIMATING and
ORDER PROCESS
PLANNING:
- Work closely with the architect, MEP Engineers, food service
consultant, food service equipment provider, beverage line
provider and/or installer responsible for the project.
- Together, identify the specific locations where the end
points will terminate.
- Identify the path(s) each system or network will follow.
- Assure that a layout drawing has been completed.
ESTIMATING:
- Takeoff measurements from drawings or layout.
- For a quotation, click on the COLOMBO "ESTIMATE/ORDER
FORM" at the right to identify the materials required.
- Our goal is to respond to quote requests within 24 hours.
ORDER PROCCESS:
- Fax or e-mail Purchase Order to COLOMBO.
- Normal shipping is within 5 business days ARO.
- Acknowledgment of order and estimated ship date and shipping
charges will be provided within 24 hours of receipt of order.
- Credit Card is the preferred method of processing orders.
- Pre approved credit is available. Allow a minimum of
ten(10) business days.
|
|
Copyright © 2001 COLOMBO BeverageCHASE® All rights reserved.
Comments are welcomed through E-mail.
|
|
|